Jiangsu Plaza Premium Electric Instrument Co.,Ltd.(HY)
To heat the floor of building, cooling house and warehouse. To melt snow and frost in slope, trough and roof. To prevent frost and to preserve heat of petroleum pipeline and other devices.
Our Experience
30+
YEARS OF EXPQuality Assurance
Fast delivery
Support OEM
To heat the floor of building, cooling house and warehouse. To melt snow and frost in slope, trough and roof. To prevent frost and to preserve heat of petroleum pipeline and other devices.
This red point means the contact point between the spirally wound heating wire and the main cable(we call it the heating node).The area between the two heating nodes is an effective heating circuit.
Power output at 230V | 40W/m |
Max.exposure temp.pwer on | 55℃ |
Max.exposure temp.power off | 70℃ |
Maximum cicuit length | 60m |
Heating zone length | 500m |
Tinned copper conductors | 2×0.75mm2 |
Heating conductor element | Nickel-chrome |
Insulation material | Silicone rubber |
Electric strength test voltage | 1500V- |
Loading tolerance | ±7% |
Out dimensions nominal | 8×5±0.5mm |
Minimum bend radius at-25℃ | 20mm |
Standard real length | 100-150m |
SSuit for outdoor pool&Fish pond